Irrigation System Capacity Calculator
Work out the system flow a field needs to keep up with peak crop water use — total gpm and gpm per acre — or turn it around and see how many acres a well or pump can irrigate. State the need as peak daily use, a depth every so many days, or a known gpm per acre, and include pumping hours, efficiency and load-control or maintenance downtime.
System capacity calculator
How the calculator works
A field’s system must put back what the crop uses on its hottest days, in fewer hours than there are in a day, with some water lost on the way.
- Needpeak use (in a day), or depth ÷ interval days
- Gross capacitygpm per acre = need × 452.57 ÷ (pumping hours × efficiency)
- Off-time× 7 ÷ operating days, or × 168 ÷ (168 − downtime hours a week)
- Known capacitya gpm per acre you already have is used as entered
- Flow neededgross gpm per acre × acres
- Acres coveredavailable gpm ÷ gross gpm per acre
- Metricm³ a day = ha × 10 × mm ÷ efficiency; L/s = m³ a day × 1,000 ÷ (hours × 3,600)
Peak use comes from the ET calculator and the crop’s water need from the water requirement calculator.
Worked examples
A 130-acre pivot
- Inputs0.32 in a day; 22 h pumping; 85 %.
- Result0.32 × 452.57 ÷ (22 × 0.85) = 7.745 gpm per acre; × 130 = 1,007 gpm.
- With 24 h a week of load control× 168 ÷ 144 = 1.167 → 9.035 gpm per acre, 1,175 gpm.
A set-moved field
- Inputs40 acres; 2 in every 7 days; 12 h a day; 75 %.
- Result2 ÷ 7 = 0.286 in a day → 14.37 gpm per acre; 575 gpm. Pumping only 12 hours doubles the rate a 24-hour system needs.
How many acres a well covers
- Known capacity800 gpm ÷ 6.6 gpm per acre = 121.2 acres.
- From peak use500 gpm; 0.30 in a day; 20 h; 80 % → 8.486 gpm per acre; 58.9 acres.
- Metric50 ha; 7 mm a day; 20 h; 85 % → 4,118 m³ a day; 57.19 L/s (906 gpm); 1.144 L/s per ha.
GPM per acre chart
| Peak use | 24 h a day | 22 h | 20 h | 12 h |
|---|---|---|---|---|
| 0.20 in a day | 4.44 | 4.84 | 5.32 | 8.87 |
| 0.25 in a day | 5.55 | 6.05 | 6.66 | 11.09 |
| 0.30 in a day | 6.66 | 7.26 | 7.99 | 13.31 |
| 0.35 in a day | 7.76 | 8.47 | 9.32 | 15.53 |
1 gpm per acre = 0.156 L/s per ha. Size the pump for the flow with the irrigation pump calculator.
Efficiency by system
| System | Starting value | Typical range |
|---|---|---|
| Center pivot, impact sprinklers | 85 % | 75–90 % |
| Pivot, low-pressure spray or LEPA | 90 % | enter your own |
| Solid set or hand move | 75 % | 70–85 % |
| Drip | 90 % | 85–95 % |
| Furrow | 65 % | 60–80 % |
Downtime and load control
Choose one off-time type. “Operating days per week” suits a pump that runs 6 days out of 7; “downtime hours per week” suits load control and maintenance. Using both would count the same lost time twice. For a pivot, check the depth each pass puts on with the center pivot calculator, and price the season’s pumping with the pumping cost calculator.
Mistakes to avoid
Depth per set as a rate
“1 inch in 4 hours” is a depth per session, not 1 in/hr. Use the depth-per-interval option.
Applying efficiency twice
A known gpm per acre from a guide is already gross. Don’t divide it by efficiency again.
mm entered as inches
7 mm a day is 0.28 in. A peak over 0.5 in a day usually means mixed units.
Ignoring the well’s yield
The well must deliver the flow for weeks, not just on a test day. Use pumped yield, not static.
How we build and check this calculator
Every formula on this page names its source, and the code is tested against worked cases before every update.
- Methods from recognised sources. The capacity equation and downtime adjustment follow University of Nebraska Extension; efficiencies follow NCAT ATTRA. See the sources.
- Tested against worked cases. Eight cases run against the calculator code before every update, including the Nebraska pivot example with and without load control, a set-moved field, two well-coverage cases, a metric field and too much downtime. All must match.
- Honest about limits. Water rights and permits may cap your flow. This page doesn’t check them.
- Your entries stay on your device. The calculator runs in your browser. Nothing you type is sent anywhere; your inputs live only in the page address, so you can bookmark or share a result.
- Corrections are welcome. If a number looks wrong, tell us. We check it against the sources, fix the page and update the date at the top.
Page history
- Published. Methods, test cases and source links checked.
Questions
How many gpm per acre do I need for irrigation?
It depends on peak crop water use, pumping hours, efficiency and downtime. Many designers use about 6–7.5 gpm per acre for full irrigation in dry summers; sandy soils and hot regions need more, deep loams with rain less.
What is system capacity?
The flow an irrigation system delivers per acre, usually in gpm per acre or inches a day. It must keep up with the crop’s peak water use, or the soil dries out during hot spells.
How many acres can my well irrigate?
Divide the well’s flow by the gpm per acre you need. An 800 gpm well at 6.6 gpm per acre covers about 121 acres; at a higher peak need it covers fewer.
How does load control change the pump size?
If the power company can shut the pump off for 24 hours a week, the system has 144 hours to do 168 hours of work, so capacity must rise by 168 ÷ 144 = 1.167. The off-time setting does this for you.
What is the difference between gross and net capacity?
Net capacity is what the crop must get. Gross capacity is what the pump must deliver, larger because some water is lost to evaporation, drift and uneven application. Gross = net ÷ efficiency.
Why do some worksheets use 450 or 453?
One acre-inch is 27,154 gallons, so one acre-inch an hour is 452.57 gpm. Worksheets round it to 450 or 453 for hand arithmetic; results differ by up to about 0.6 %.
Does soil type change the capacity I need?
Yes. Soils that hold more water carry the crop through short peaks, so a slightly lower capacity can work. Sandy soils hold little, so the system must keep up day by day.
Sources
- University of Nebraska–Lincoln Extension, Minimum Center Pivot Design Capacities in Nebraska (G1851). Gross capacity from peak water use, hours and efficiency, and the 168 ÷ (168 − downtime) adjustment; a worked pivot example used as a check.
- University of Nebraska–Lincoln CropWatch, Irrigation Management with Limited Capacity or Water Allocations. Dividing net capacity by efficiency and raising it for load-control downtime.
- NCAT ATTRA, Measuring and Conserving Irrigation Water. Attainable application efficiencies by system type (pivot, set, drip, furrow) used for the starting values and ranges.
- Kansas State University Research and Extension, Irrigation Formulas and Conversions (MF-2404). Acre-inch and flow relations behind gpm per acre-inch an hour.
- The exact constant (27,154.29 gal ÷ 60 = 452.57 gpm per acre-inch an hour), the depth-per-interval form and the metric version (m³ a day = ha × 10 × mm ÷ efficiency) are derived on this page.
Links checked November 16, 2026. The page reproduces the Nebraska example (7.75 gpm per acre; about 1,007–1,008 gpm on 130 acres) and a Texas A&M example (800 gpm at 6.6 gpm per acre ≈ 121 acres).